#3 Improve Mobility and Travel Bus Terminal Wawasan
Bus Terminal North - Inanam
Bus Terminal South - Kepayan
Bus Rapit Transit System (BRT)
One Way Traffic System



 Proposed one way traffic flow (submitted by DBKK)

ONE WAY TRAFFIC SYSTEM

To provide systematic motorised traffic route to compliment existing road network and BRT system

Challenges
• Have to coordinate with the inflow and outflow of vehicles during physical implementation stage
• Relocation of underground utilities Enablers Required to make it happen
• Proper traffic management plan within CBD before implementation
• Cooperation within Government Agencies & Utilities companies required

Key outcome / benefit of this project
• Reduce traffic congestion
• Increase transportation efficiency
• Encourage use of public transport

BUS RAPID TRANSIT SYSTEM (BRT)

To build designated bus way integrated into current road system like a LRT that stops within ~ 1 km
Constructing bus stops along designated bus lane
Replacing old buses (mini and stage buses) with shuttle bus (44-seater)
Linking Terminal Wawasan, Terminal Inanam & Terminal Kepayan
Priority signalling system
One way traffic flow in CBD Distance: ~30km

Challenges
• To cluster and manage current existing mini bus operators
• To align the bus routes
• Construction of the physical bus way
• Allocation of the physical bus way
• Land Acquisition/allocation Enablers Required to make it happen
• Buses should be at least 10 years
• Provide first aid kits & fire extinguishers
• Appropriately trained bus drivers
• Creating a new ticketing system computer (eg. Octopus, EZ link)

Key outcome / benefit of this project
• Integrated public bus system
• Increase public transport delivery and efficiency
• Decrease the waiting period
• Increase public bus capacity
• Decrease the over supply of mini buses/vans