ONE WAY
TRAFFIC SYSTEM
To provide systematic motorised traffic route to
compliment existing road network and BRT system
Challenges
• Have to coordinate with the inflow and outflow of
vehicles during physical implementation stage
• Relocation of underground utilities
Enablers Required to make it happen
• Proper traffic management plan within CBD before
implementation
• Cooperation within Government Agencies & Utilities
companies required
Key outcome / benefit of this project
• Reduce traffic congestion
• Increase transportation efficiency
• Encourage use of public transport
BUS RAPID TRANSIT SYSTEM (BRT)
To build designated bus way integrated into
current road system like a LRT that
stops within ~ 1 km
Constructing bus stops along designated
bus lane
Replacing old buses (mini and stage buses)
with shuttle bus (44-seater)
Linking Terminal Wawasan, Terminal Inanam
& Terminal Kepayan
Priority signalling system
One way traffic flow in CBD
Distance: ~30km
Challenges
• To cluster and manage current existing mini bus
operators
• To align the bus routes
• Construction of the physical bus way
• Allocation of the physical bus way
• Land Acquisition/allocation
Enablers Required to make it happen
• Buses should be at least 10 years
• Provide first aid kits & fire extinguishers
• Appropriately trained bus drivers
• Creating a new ticketing system computer (eg.
Octopus, EZ link)
Key outcome / benefit of this project
• Integrated public bus system
• Increase public transport delivery and efficiency
• Decrease the waiting period
• Increase public bus capacity
• Decrease the over supply of mini buses/vans |